1. Relay data Excel
One tab per relay: relay model in E4, bay list in J4, datasheet in F6, table rows from row 8. The file stays on this PC; nothing is uploaded.
Drop the data Excel here, or click to choose
.xlsx
Auto-fill steps 2-6 from a drawing (optional)
Drop a B02 (or any IOB drawing) PDF of the same project. Title block, sign-off, revisions, cover status and logos are copied in; the drawing number gets the T07 suffix. Filled fields turn green - check them before building.
Drop the drawing PDF here, or click to choose
.pdf
2. Drawing & project information
Fills the yellow cells of the MASTER sheet. You can still change everything in Excel afterwards.
3. Sign-off
4. Revision log
Oldest first. The last row is the current revision. Up to 10 rows.
| Rev. | Revision notes | Date | Sheet no(s). | DRN/CHK/APP | Approved |
|---|
5. Data sheets
6. Logos
Leave as is to use the standard logos, or pick a new picture (PNG or JPG).